• Schinko boosts productivity by 20%

Schinko boosts productivity by 20%

The Austrian company has increased quality and production throughput with the help of GFT.
All production areas at the enclosure manufacturer Schinko GmbH are being gradually connected to a fully integrated digital shop floor management system. This is enabling production transparency as well as prompt intervention when required – also automatically.

20% higher productivity

Information in real time

Reduction in set-up times

schinko-logo-claim-1zeilig_4C-high.png
Client
Schinko
Schinko GmbH, based in Neumarkt im Mühlkreis/Upper Austria, is an established specialist in the German-speaking region for customised machine and equipment enclosures, associated integrated control cabinet technology and workplace design. Schinko takes over the entire manufacturing process from the first sketch to prototype construction to the final product.

Challenge

Challenge

What to do with the data?

Engagement

Engagement

Start: Proof of concept

Christian Deinhofer
Plant Manager
Schinko

Benefit

Benefit

Increased motivation and productivity

Gerhard Lengauer
Managing Director
Schinko

Download – just one click away

  • Success story

    Schinko boosts productivity by 20%